Selling into the EU? Your packaging now needs its own compliance file.
The EU Packaging and Packaging Waste Regulation (PPWR) has applied since 12 August 2026. Every packaging type you place on the EU market needs technical documentation and a signed EU Declaration of Conformity. We build both for you, and tie them into the quality files you already run.
Read: Has PPWR been delayed? →
Verified on 20 November 2026 against Regulation (EU) 2025/40
What changed on 12 August 2026
Regulation (EU) 2025/40 replaced the old EU Packaging Directive. It applies directly in all 27 EU countries, with no national version to wait for (Article 71).
Three things apply now:
| What applies now | What it means for you | Article |
|---|---|---|
| Technical documentation and EU Declaration of Conformity | The manufacturer must document each packaging type and sign a declaration before placing it on the market | Art. 15, 38, 39 |
| Heavy metals limit | Lead, cadmium, mercury and hexavalent chromium together must stay at or below 100 mg/kg | Art. 5(4) |
| Producer registration and fees | Whoever first makes the packaging available in an EU country registers and pays there. Non-EU sellers shipping direct to end users need a local authorised representative in each country | Art. 44, 45 |
Recyclability, recycled content, packaging minimisation and empty-space limits follow from 2030. The work to meet them starts now, because a pack change in a regulated product takes years.
Authorities can ask for your documents at any time. You have 10 days to hand them over (Art. 15(10)).
Who we work with
We are built for one kind of company. You are a fit if all five of these are true:
- You are based outside the EU (US first) and sell into at least one EU country.
- You are mid-size, roughly $50M to $1B in revenue.
- Your packaging is part of product safety or approval, so changing a pack means re-testing or re-approval.
- You have quality or regulatory staff, and budget for outside help.
- You do not yet have a complete PPWR technical file and Declaration of Conformity.
If changing a box is cheap for you, a self-serve software tool is probably the better buy. We say that up front.
What you get
| Service | What you get | Typical length |
|---|---|---|
| 1. Exposure Scan | A list of every packaging item you sell into the EU, who is legally responsible for each one, and a gap list ranked by risk | 2 weeks |
| 2. Conformity Sprint | Technical file and Declaration of Conformity for each packaging family, with supplier evidence collected and gaps closed | 6 to 10 weeks |
| 3. Managed Compliance | A monthly watch on new EU rules, supplier declarations kept current, files updated when your products or the rules change | Ongoing |
| 4. 2030 Redesign Roadmap | Which packs must change before 2030, in what order, with supplier options and the validation effort each change sets off | 4 to 6 weeks |
Every engagement starts with the Exposure Scan. Pricing is set per engagement, based on your packaging families and EU countries, and sent in a written proposal.
Done for you, not a software login
You send us your bills of materials, packaging specifications, drawings, label artwork and supplier declarations. You get back finished, reviewed documents.
- AI does the heavy lifting. It builds the packaging inventory, checks each item against the regulation article by article, chases suppliers for missing declarations, and drafts the files.
- A certified Lead Auditor reviews every file. ISO 13485 (BSI, 2019) and ISO/IEC 42001 AI Management Systems (BSI, 2026).
- You stay the signatory. The law puts the Declaration of Conformity on the manufacturer (Art. 39(4)). We prepare it. You sign it. We never sign for you.
- We flag the knock-on effects. If a finding touches another regulated file, such as a device technical file, a risk file or a validated process, you see it before anything changes.
Industries
Medical technology and devices — live now. Device packaging is only partly exempt. Most teams think it is fully exempt. → Read the medical device page
More industries will follow, one at a time.
Where the rules stand today
The regulation applies in full. Several of the detailed EU rules that support it are late. We track every one on a dated page, updated monthly.
| Item | Status on 20 November 2026 |
|---|---|
| PPWR application date | 12 August 2026. Not delayed |
| National penalty rules | Due from every EU country by 12 February 2027 (Art. 68). Germany's fines for PPWR breaches start that day |
| Harmonised waste-sorting label rules | Overdue. Now expected in Q2 2027 |
| Authorised representative suspension | Proposed, not adopted. Positions so far would relieve EU-based firms only |
Answers
Short, dated answers to the questions buyers ask most. Each one cites the article of the regulation.
- Has PPWR been delayed? What applies today
- PPWR Declaration of Conformity: what goes in it and who signs
- US companies and PPWR: do you need an EU authorised representative?
- PPWR deadlines after August 2026: what is fixed and what slipped
- PPWR heavy metals limit: what to ask your packaging suppliers
- Manufacturer, importer or producer: which PPWR role are you?
Find out what you are exposed to in two weeks.
The Exposure Scan lists every pack you sell into the EU, names who is legally responsible for each, and ranks the gaps. You leave with a plan whether or not you hire us for the rest.