Answers

PPWR deadlines after August 2026: what is fixed and what slipped

Verified on 20 November 2026 against Regulation (EU) 2025/40 · Relies on: Articles 6, 7, 10, 12, 24, 29, 44, 68, 71

The dates written into the regulation are fixed. The dates written as "this date or X months after the Commission's rules, whichever is later" move when the Commission is late, and several of those rules are late. The next fixed date is 12 February 2027, when every EU country must have penalties in place (Art. 68). The big design changes, including recyclability, recycled content, minimisation and the 50% empty-space limit, land from 1 January 2030.

The timeline

DateWhat startsFixed or can move?Article
12 Aug 2026Regulation applies: Declaration of Conformity, technical documentation, heavy metals, food-contact PFAS, producer dutiesFixed. Already in forceArt. 71
12 Feb 2027National penalty rules in place in all EU countriesFixedArt. 68
12 Feb 2028Empty space in sales packaging cut to the minimum needed to protect the productFixedArt. 24(4)
12 Aug 2028 or laterHarmonised waste-sorting labelMoves. Starts 24 months after the label rules, which are lateArt. 12(1)
1 Jan 2030Weight and volume of all packaging reduced to the minimum necessaryFixedArt. 10(1)
1 Jan 2030 or laterRecyclability grades A, B or CMoves. 24 months after the design-for-recycling rules if laterArt. 6(3)
1 Jan 2030 or laterMinimum recycled content in plastic packaging (10% to 35% by type)Moves. 3 years after the calculation rules if laterArt. 7(1)
1 Jan 2030 or laterMaximum 50% empty space in grouped, transport and e-commerce packagingMoves. 3 years after the method rules if laterArt. 24(1)
1 Jan 203040% of certain transport packaging must be reusable (cardboard boxes excluded)See note belowArt. 29
1 Jan 2035Commission review of the pharma, medical device and other recyclability exemptionsFixed review dateArt. 6(12)
1 Jan 2035 or laterPackaging must be "recycled at scale"MovesArt. 6(2)
1 Jan 2038Only recyclability grades A or B allowedFixedArt. 6(3)
1 Jan 2040Higher recycled content (25% to 65% by type)Fixed, subject to a 2032 reviewArt. 7(2), 7(14)

Note on reuse targets: Article 29 says 1 January 2030. The Commission's FAQ links the start to the calculation rules due under Article 30(3). Watch for clarification.

40% or 50%? The empty-space confusion

Some guides quote a 40% empty-space limit. The regulation says 50% (Art. 24(1)). The 40% figure belongs to a different rule: the 2030 reuse target for transport packaging (Art. 29(1)). Filling material such as air cushions, paper or foam counts as empty space (Art. 24(3)).

What has slipped so far

Commission ruleWas dueStatus on 20 November 2026Knock-on
Producer register format12 Feb 2026Not adoptedCountries get 18 months after it to align registers (Art. 44(1))
Harmonised label12 Aug 2026Missed. Expected Q2 2027Label duty not before mid-2029 in practice
Recycled content method31 Dec 2026PendingPushes the 2030 recycled content date if late
Design-for-recycling criteria1 Jan 2028PendingSets when recyclability grades start

How to plan around moving dates

Plan to the earliest date in each row. A late Commission rule gives you extra time, but you cannot count on how much. In regulated products, a pack change can take one to three years once testing, validation and approvals are included. That makes a 2030 rule a 2027 project.

Want your packs mapped against each date?

Book an Exposure Scan

Sources: Regulation (EU) 2025/40 (OJ L, 22.1.2025); DG ENV PPWR FAQ, March 2026; Packaging Insights on the label delay, October 2026. General information, not legal advice.