PPWR status tracker

Verified on 20 November 2026 · Next update: December 2026

Short answer: The PPWR has applied since 12 August 2026 and has not been delayed (Article 71). What is late are several of the detailed EU rules that support it, mainly on labelling and producer registration. Nothing late changes the duty to hold a technical file and Declaration of Conformity today.

Applies now

RequirementApplies fromArticle
Regulation in force11 February 2025Art. 71
Regulation applies12 August 2026Art. 71
Technical documentation, conformity assessment, EU Declaration of Conformity12 August 2026Art. 15, 38, 39; Annex VII, VIII
Heavy metals: lead + cadmium + mercury + hexavalent chromium ≤ 100 mg/kg12 August 2026Art. 5(4)
PFAS limits in food-contact packaging12 August 2026Art. 5(5)
Producer registration and extended producer responsibility12 August 2026, through national schemesArt. 44, 45
EPR authorised representative for producers selling directly to end users in another country12 August 2026Art. 45(3)
Documents handed to an authority within 10 days of a request12 August 2026Art. 15(10), 18(8)

Coming next

RequirementDate in the regulationArticle
National penalty rules in place12 February 2027Art. 68
Germany: fines for PPWR breaches, up to €200,000 per breach12 February 2027German VerpackDG §66
Empty space in sales packaging reduced to the minimum needed12 February 2028Art. 24(4)
Harmonised waste-sorting label12 August 2028, or 24 months after the implementing act, whichever is laterArt. 12(1)
Packaging minimisation: weight and volume to the minimum necessary1 January 2030Art. 10(1)
Recyclability grades A, B or C1 January 2030, or 24 months after the design-for-recycling rules, whichever is laterArt. 6(3)
Minimum recycled content in plastic packaging1 January 2030, or 3 years after the calculation rules, whichever is laterArt. 7(1)
Maximum 50% empty space in grouped, transport and e-commerce packaging1 January 2030, or 3 years after the method rules, whichever is laterArt. 24(1)
Reuse targets for transport packaging (40%, cardboard boxes excluded)1 January 2030; the Commission FAQ links the start to the calculation rules under Art. 30(3)Art. 29(1), 29(4)
Commission review of the medical, pharma and other exemptions from recyclabilityBy 1 January 2035Art. 6(12)
Recycled at scale1 January 2035 or laterArt. 6(2)
Recyclability grades A or B only1 January 2038Art. 6(3)

Late or pending EU rules

RuleWas dueStatus on 20 November 2026What it means
Format for producer registers12 February 2026 (Art. 44(14))Not yet adoptedNational registers run on current national systems. EU countries get 18 months after the act to align (Art. 44(1))
Harmonised label and labelling specifications12 August 2026 (Art. 12(6))Missed. Adoption now expected Q2 2027, after a public consultationThe label requirement starts 24 months after the act, so not before mid-2029 in practice
Digital marking of material composition12 August 2026 (Art. 12(7))MissedSame knock-on as above
Recycled content calculation and verification method31 December 2026 (Art. 7(8))PendingIf late, the 2030 recycled content date moves back with it
Design-for-recycling criteria1 January 2028 (Art. 6(4))PendingSets when recyclability grades start

Proposals that could change the rules

ProposalStatus on 20 November 2026What to do now
Suspend the EPR authorised representative duty (Art. 45(3)) until 1 January 2035 — Commission proposal of 10 December 2025Parliament adopted its position on 20 October 2026 and the Council on 21 October 2026. Both would relieve EU-based producers only. Talks between the institutions come nextNon-EU sellers: assume the duty stays. Article 45(3) applies as published

Commission guidance published

DocumentDateUseful for
Guidance document on Regulation (EU) 2025/40Approved 30 March 2026Who the manufacturer is; that pre-filled syringes and IV bags are not packaging; that the waste-sorting label does not apply to devices used only by professionals
PPWR Frequently Asked Questions (DG ENV)March 2026Declarations of Conformity per packaging type; documenting exemptions in the technical file

Change log

DateChange
20 November 2026Page launched