Answers

PPWR heavy metals limit: what to ask your packaging suppliers

Verified on 20 November 2026 against Regulation (EU) 2025/40 · Relies on: Articles 5(4), 5(6), 16, 70(3); Annex VII

Ask each packaging supplier for a signed declaration, per component, that the combined concentration of lead, cadmium, mercury and hexavalent chromium is 100 mg/kg or less, with the evidence behind it. The limit is in Article 5(4) and has applied since 12 August 2026, to the packaging and to every packaging component. You must show compliance in your technical documentation (Art. 5(6)), and your suppliers must give you the information you need to do so (Art. 16(1)).

The rule in one table

PointDetailArticle
SubstancesLead, cadmium, mercury, hexavalent chromiumArt. 5(4)
LimitSum of all four at or below 100 mg/kgArt. 5(4)
ScopeThe packaging and each packaging component, including inks, coatings, adhesives and labelsArt. 5(4)
Applies from12 August 2026Art. 71
ProofIn the technical documentationArt. 5(6), Annex VII
Supplier dutyProvide the information and documents you needArt. 16(1)
Existing derogationsGlass packaging, and plastic crates and pallets, under earlier Commission decisions that remain in forceArt. 70(3)

The same 100 mg/kg limit applied under the old Packaging Directive. What is new is that you must hold the evidence in a PPWR technical file and sign a Declaration of Conformity on it.

What to ask for

Field in the supplier declarationWhy you need it
Supplier name, address and signatorySo the declaration is attributable
Component name, part number and specification revisionTies the evidence to the exact component in your bill of materials
Statement that Pb + Cd + Hg + Cr(VI) ≤ 100 mg/kgThe requirement itself
Basis: test report, or formulation and raw-material knowledgeAuthorities can ask how the supplier knows
Test method and laboratory, if testedLets you judge the evidence
Scope: every layer, ink, coating, adhesive and label on the componentComponents often fail on inks or pigments, not the base material
Date and validity, and a promise to tell you about changesYour declaration must stay current (Art. 39(2))
Any derogation relied onGlass or plastic crates and pallets only

While you are asking, ask for the rest

The same request can collect what your file will need later:

One well-built request now saves three rounds of chasing later.

Where it usually goes wrong

Want the supplier chase done for you? Our Conformity Sprint drafts, sends and tracks every request.

Book an Exposure Scan

Sources: Regulation (EU) 2025/40 (OJ L, 22.1.2025). General information, not legal advice.